Most sizing guides lead with cubic yards. That is the least useful number, because almost nobody can estimate their own debris in cubic yards. Here is how we actually do it on the phone.

Why cubic yards is the wrong question
Every dumpster sizing guide opens the same way: a 10 yard holds ten cubic yards, a 20 yard holds twenty. True, and almost completely useless, because nobody standing in their garage looking at thirty years of accumulated stuff can convert that into cubic yards.
What we actually ask on the phone is three questions. What are you throwing away? How much of it, in terms you can picture — pickup loads, rooms, squares of roof? And where is it going to sit? Those three answers get us to the right container about ninety-five percent of the time, and everything after that is about weight.
The two constraints: volume and weight
Every container has two limits and you will hit one of them first. Volume is the obvious one: the box is only so big and you cannot legally load above the top rail. Weight is the one people forget, and it is the one that costs money.
Each size comes with an included tonnage. A 10 yard typically includes one to two tons, a 30 yard four to five. Go over and you pay a per-ton overage rate, which we quote before you book, so it is never a surprise — but it is still money you did not need to spend.
What each size really holds
10 yard — 12 ft × 8 ft × 3.5 ft
Three to four pickup loads. One to two tons included. The small-job container and, more importantly, the heavy material container. A bathroom gut. A garage clear-out. A patio slab. Broken concrete, brick, tile. Low three-and-a-half-foot sides mean you can throw material over the wall without a ramp, which matters when you are handling broken slab by hand.
Around here it is also the foundation-repair container. More on that below.
15 yard — 16 ft × 8 ft × 4 ft
Five to six pickup loads. Two to three tons. The most under-used size in the industry and frequently the right one in the older Katy subdivisions, where the original single-width drives in Nottingham Country, Bear Creek and Mission Bend often will not take anything longer.
20 yard — 22 ft × 8 ft × 4.5 ft
Seven to eight pickup loads. Three to four tons. Our most popular container by a wide margin, because it covers the three most common real-world projects: a shingle re-roof, a full kitchen renovation, and a three-bedroom whole-house clear-out.
30 yard — 22 ft × 8 ft × 6 ft
Ten to twelve pickup loads. Four to five tons. Same footprint as the 20 with eighteen more inches of height, so it holds half again as much without needing any more driveway. The builder's container, and the right call on the active build sections in Fulshear and Cross Creek Ranch.
Worked examples from real Katy jobs
| Job | Size | Why |
|---|---|---|
| Bathroom gut with tile floor | 10 yard | Small volume, but tile and a cast iron tub are heavy |
| Foundation repair spoil and old piers | 10 yard | Concrete and soil - dense, and very common here |
| Patio slab removal | 10 yard | Concrete is roughly 2 tons per cubic yard |
| Two-car garage clear-out | 10-15 yard | Bulky, light, easy to load |
| 1980s house, single-width drive | 15 yard | Length is the limit, not volume |
| Kitchen renovation, mid-size | 15-20 yard | Cabinetry eats volume; a tile floor pushes weight up |
| Shingle re-roof, 28 squares, single layer | 20 yard | Around 4 tons of shingle - at the allowance limit |
| Three-bed whole-house clear-out | 20 yard | Furniture and mattresses eat volume fast |
| Flood gut, whole house | 20 yard | Saturated material is far heavier than it looks |
| New-build framing and drywall | 30 yard | Bulky and light - you run out of volume first |
The weight traps around here
Concrete, block and brick
Roughly 4,000 pounds per cubic yard. A single cubic yard of broken slab weighs about as much as a small car. This is why we will not put concrete in anything larger than a 10 yard, and why we will tell you to stop filling somewhere between half and two-thirds.
Foundation work
Worth its own mention because it is so common in this part of Texas. The soil here is expansive clay that swells and shrinks with moisture, and slab movement is a routine homeowner problem. Foundation repair produces broken concrete, spoil and old piers — all dense. A 10 yard, part-filled, every time.
Anything that has been wet
Saturated drywall, insulation, carpet, subfloor and cabinetry weigh a multiple of their dry equivalent. Given the flooding history on this side of Houston, this comes up often. If your job is flood-related, say so when you book and we will size for weight rather than for how the pile looks.
Rain in an open container
This is the Gulf Coast. An open container left through a wet week gains real weight you pay for by the ton. If the load is already dense, keep it covered.
When the driveway decides for you
In a lot of Katy the binding constraint is not the debris at all — it is the driveway. The 1970s and 1980s subdivisions were built with single-width drives, and the live oaks and pecans have had forty or fifty years to grow over them.
The arithmetic: a 20 yard is twenty-two feet long, the truck needs roughly another ten feet of clear run behind it to roll the container off, and raising the bed needs about twenty-two feet of vertical clearance. A mature live oak does not negotiate on that last one.
Which is why we will sometimes tell you a 15 yard with one swap is the right answer even though a 20 would hold the job. A container that does not fit is worth nothing at all.
Two smaller containers vs one big one
On larger jobs this is frequently the cheaper route, and almost nobody asks about it.
Disposal is priced by stream. Mixed construction and demolition debris costs more per ton than clean concrete. Clean brush has its own route. Scrap metal is sometimes worth money rather than costing it. Texas regulates this through the TCEQ landfill classes: a Type IV site takes brush, construction and demolition waste and rubbish that is free of household waste, while mixed household material has to go to a Type I site.
So on a demolition producing concrete, clean timber and general debris, two containers will very often cost less in total than one mixed 30 yard, even after paying for the extra movement.
The test is whether you have enough of a clean stream to justify a dedicated container. Half a container of clean concrete, yes. A wheelbarrow full, no.
How to describe your job on the phone
- What the material is. "Kitchen cabinets, countertop, appliances and about 200 square feet of tile floor" tells us everything.
- Roughly how much. Rooms, squares of roof, or pickup loads.
- Whether anything has been wet. It changes the weight answer completely.
- Where it is going, and how long the driveway is.
- Anything unusual. Low branches, a gate code, an HOA, ground that has been soft.
That is a ninety-second conversation and it is the difference between a flat rate that holds and an estimate that moves. Call and describe the job — we will size it honestly, including telling you when a smaller and cheaper container is the right answer.
Need a container in Katy?
Call and describe the job. Three minutes on the phone gets you a size recommendation, a flat rate and a delivery window — and we will tell you if a smaller, cheaper container is the right answer.